阀门到货先查三证

来源:http://www.jnlgvf.com/ 日期:2026-11-12 发布人:创始人

工业阀门出问题,不一定在用了多久,往往在拆箱那一刻就埋了雷。很多项目验收只核对“DN、PN、数量”,忽略三份关键文件,装上去再漏,责任就扯不清。

When industrial valves have problems, it doesn't necessarily take long to use them. Often, lightning strikes at the moment of unpacking. Many project acceptance checks only verify "DN, PN, quantity", ignoring three key documents. If they are installed and leaked again, the responsibility cannot be clarified.

蝶阀02

第一证:材质证明(材质单)

First certificate: Material certificate (material list)

阀体、阀盖、阀杆、密封面不能只写“不锈钢/铸钢”。要看到具体牌号:WCB、CF8、CF8M、WC6、F304……对应化学成分和力学性能。含氯工况说“用不锈钢”不够,得确认是316L还是双相钢。没有材质单,后期晶间腐蚀、应力开裂,连溯源都做不到。

The valve body, valve cover, valve stem, and sealing surface cannot only be written as "stainless steel/cast steel". To see the specific grades: WCB, CF8, CF8M, WC6, F304... corresponding chemical composition and mechanical properties. The use of stainless steel is not sufficient for chlorine containing conditions, and it needs to be confirmed whether it is 316L or duplex steel. Without a material list, intergranular corrosion and stress cracking cannot be traced in the later stage.

第二证:压力与密封试验报告

Second certificate: Pressure and sealing test report

出厂要做壳体强度试验和密封试验。看报告里的试验压力、保压时间、介质(水/气)、泄漏等级。金属密封闸阀允许微漏,但化工、燃气、有毒介质通常要气泡级气密试验,不能只拿水压报告顶替。气体介质比液体更挑密封,这一条现场常漏看。

Shell strength and sealing tests must be conducted before leaving the factory. Check the test pressure, holding time, medium (water/gas), and leakage level in the report. Metal sealed gate valves allow for slight leakage, but chemical, gas, and toxic media usually require bubble level airtightness testing, and cannot be replaced by water pressure reports alone. Gas media are more selective and sealed than liquids, which is often overlooked on site.

第三证:可追溯标识

Third certificate: Traceable identification

阀体铭牌应有:厂名或商标、型号、DN、PN/Class、材质、流向、执行标准、出厂编号。核级、电站阀还要有炉批号、探伤记录、质保书编号。编号对不上台账,等于件和纸是两套系统。

The valve body nameplate should have: factory name or trademark, model DN、PN/Class、 Material, flow direction, execution standard, and factory number. Nuclear grade and power plant valves must also have furnace batch numbers, inspection records, and quality assurance certificate numbers. The numbering does not match the ledger, which means that the document and paper are two separate systems.

除了三证,到货还要做“三看”:

In addition to the three certificates, there are also three inspections required upon arrival:

看外观:铸件无砂眼、无补焊痕迹,法兰密封面无划伤,螺栓孔同心度正常。

Appearance: The casting has no sand holes or welding marks, the flange sealing surface is not scratched, and the concentricity of the bolt holes is normal.

看流向:截止阀、止回阀、调节阀有箭头,装反直接失效。

Check the flow direction: there are arrows on the globe valve, check valve, and regulating valve, and if installed incorrectly, they will directly fail.

看附件:电动头转向、限位、力矩保护先空载测试;气动阀查气源接口和电磁阀电压。

Refer to the attachment: Conduct no-load testing on the electric head steering, limit, and torque protection; Check the gas source interface and solenoid valve voltage of the pneumatic valve.

安装前别急着焊。先吹管,把焊渣、铁锈、杂物清干净;入口加临时过滤器,保护密封面。高温阀升温后要做“热紧”,低温阀按工艺做深冷处理后再投用。

Don't rush to weld before installation. First, blow the pipe and clean up the welding slag, rust, and debris; Add a temporary filter at the entrance to protect the sealing surface. After the high-temperature valve is heated up, it should be "hot tightened", while the low-temperature valve should be subjected to cryogenic treatment according to the process before being put into use.

建档比进货更重要。每台阀建一张卡:安装位号、介质、温度压力、备件型号、上次检修时间。运行两年后,换密封件靠卡片找型号,不会把PTFE当金属密封买回来。

Filing is more important than purchasing. Each valve is equipped with a card: installation tag number, medium, temperature and pressure, spare part model, and last maintenance time. After two years of operation, the replacement of seals relies on the card to find the model, and PTFE will not be bought back as a metal seal.

阀门是管线上的安全件。三证齐全,现场才敢加压;纸证对不上实物,再便宜也是隐患。

Valves are safety components on pipelines. Only when all three certificates are complete, dare to apply pressure on site; Paper certificates cannot match physical objects, and even if they are cheap, it is a hidden danger.

热销产品:   执行驱动装置 通用工业阀门 冶金工业阀门 水利水务阀门 石油化工阀门 电力电站阀门 核电军工阀门

上海良工阀门山东济南销售处 网站备案号:鲁ICP备2021030403号-1    电话:15098929951 座机:0531—85816056 地址:济南天桥区历山北路198号国际五金机电城A区412号 
网址:http://www.jnlgvf.com/

【本站图片均由网站所有方提供,部分图片来源于网络,如无意中侵犯了某媒体或个人的知识产权,请来信或来电告之,本网站将立即删除。】