上海良工阀门始建于1946年,是国内老牌民族阀门制造企业,“工”字牌产品在核电、火电、石油化工、水利水务等重大工程项目中应用广泛,自上世纪70年代就参与秦山核电站核级阀门研发制造,具备核级阀门、高温高压电站阀门完整研发制造资质。济南作为山东工业核心市场,工程、化工、电厂、水暖项目阀门采购需求量大,上海良工阀门济南销售处面向山东区域提供选型咨询、现货供货、技术对接、售后全链条服务,不少采购方容易遇到品牌仿冒、选型失误、资料不全等问题,掌握选型、辨伪、验收要点,可规避管线泄漏、停机返工等风险。
Shanghai Lianggong Valve was founded in 1946 and is a well-known national valve manufacturing enterprise in China. Its "Gong" brand products are widely used in major engineering projects such as nuclear power, thermal power, petrochemicals, and water conservancy. Since the 1970s, it has participated in the research and development of nuclear grade valves for Qinshan Nuclear Power Plant and has complete qualifications for the research and development of nuclear grade valves and high-temperature and high-pressure power plant valves. Jinan, as the core market of Shandong's industry, has a large demand for valve procurement in engineering, chemical, power plant, and plumbing projects. Shanghai Lianggong Valve Jinan Sales Office provides selection consultation, spot supply, technical docking, and after-sales full chain services to the Shandong region. Many buyers are prone to problems such as brand counterfeiting, selection errors, and incomplete information. Mastering the key points of selection, identification, and acceptance can avoid risks such as pipeline leaks and downtime rework.

良工阀门产品线覆盖六大应用板块:核电军工阀门、电力电站阀门、石油化工阀门、冶金工业阀门、水利水务阀门、通用工业阀门,主流品类包含闸阀、截止阀、球阀、旋塞阀、止回阀、料浆阀、调节阀、平衡阀、柱塞阀,同时配套各类电动执行驱动装置,可适配从普通给排水到核电高温高压严苛工况。电站系列闸阀、截止阀可承受高温高压;料浆阀专门针对带固体颗粒介质,不易冲刷磨损;核一级、核二级、核三级阀门,执行核电专用标准,用于核电管线系统;美标系列阀门符合API6D等国际标准,适配石化出口及外资项目;水利水务的平衡阀、柱塞阀,多用于楼宇、市政给排水管网调控。
Lianggong Valve's product line covers six major application sectors: nuclear power military valves, power plant valves, petrochemical valves, metallurgical industry valves, water conservancy and water supply valves, and general industrial valves. The mainstream categories include gate valves, globe valves, ball valves, plug valves, check valves, slurry valves, regulating valves, balance valves, and plunger valves. It is also equipped with various electric actuator drive devices, which can adapt to harsh working conditions ranging from ordinary water supply and drainage to high temperature and high pressure in nuclear power plants. Power station series gate valves and globe valves can withstand high temperature and high pressure; The slurry valve is specifically designed for media with solid particles and is not easily eroded or worn; Nuclear Level 1, Nuclear Level 2, and Nuclear Level 3 valves, in accordance with nuclear power specific standards, are used for nuclear power pipeline systems; The American standard series valves comply with international standards such as API6D and are suitable for petrochemical exports and foreign investment projects; Balance valves and plunger valves for water conservancy and water management are commonly used for regulating building and municipal water supply and drainage pipelines.
阀门选型不能只看DN口径和压力,要结合介质、温度、工况综合确定。首先明确输送介质:清水、蒸汽、油气、腐蚀性化工介质、含颗粒料浆,直接决定阀体材质,水系统选用铸铁/铸钢;蒸汽高温工况选用WCB铸钢、锻钢材质;强腐蚀介质选用不锈钢;含有泥沙、矿浆介质优先料浆阀,避免密封面快速磨损失效。其次确认工作温度、实际工作压力,阀门公称压力建议留有安全余量,不能和系统工作压力持平。还要确认连接方式:法兰、对焊、丝扣;驱动方式区分手动、电动、气动;管路功能需求:切断、止回、流量调节、泄压。项目图纸仅标注型号时,需要核对阀体材质、密封面、执行机构参数,防止货不对图。很多项目出现阀门短期泄漏损坏,根源就是选型只看DN、PN,忽略介质与温度适配。
Valve selection should not only consider DN diameter and pressure, but also be determined comprehensively based on the medium, temperature, and operating conditions. Firstly, clarify the conveying medium: clean water, steam, oil and gas, corrosive chemical media, and slurry containing particles, which directly determine the valve body material. The water system should use cast iron/steel; WCB cast steel and forged steel materials are selected for high-temperature steam conditions; Stainless steel is selected as the strong corrosive medium; Priority is given to slurry valves containing sediment and slurry media to avoid rapid wear and failure of the sealing surface. Secondly, confirm the working temperature and actual working pressure. The nominal pressure of the valve must have a safety margin and cannot be equal to the system working pressure. Also need to confirm the connection method: flange, butt welding, thread; Distinguish between manual, electric, and pneumatic driving modes; Pipeline functional requirements: cut-off, check, flow regulation, pressure relief. When the project drawings only indicate the model, it is necessary to check the valve body material, sealing surface, and actuator parameters to prevent the goods from not matching the drawings. Many projects experience short-term valve leakage and damage, and the root cause is that the selection only focuses on DN and PN, ignoring the compatibility between the medium and temperature.
阀门行业仿冒“良工”字号乱象较多,市场上大量名称近似企业,采购时辨别真伪尤为关键。第一认准正品“工”字牌商标,核对厂家正规授权文件,拒绝无授权中间商。第二核对随货资料:合格证、材质证明、压力试验报告,核电、电站特种阀门还需要提供无损检测、热处理资料,资料批号建议和阀体铭牌批号一一对应。第三实物查验:阀体铸造标识清晰,铭牌完整标注型号、压力、材质、炉号;核心警惕远低于市场行情的报价,同款规格价格显著偏低大概率材质缩水。重大工业项目,签约合同内写明品牌商标、资料交付要求,作为验收依据。
There are many counterfeit "Lianggong" brand names in the valve industry, and there are a large number of companies with similar names in the market. It is particularly important to distinguish the authenticity when purchasing. First, identify the genuine "Gong" trademark, verify the manufacturer's formal authorization documents, and reject unauthorized intermediaries. The second verification of accompanying documents: certificate of conformity, material certification, pressure test report. Non destructive testing and heat treatment materials are also required for special valves in nuclear power plants. The batch number of the materials must correspond one-to-one with the valve body nameplate batch number. Third physical inspection: The valve body casting identification is clear, and the nameplate is fully marked with the model, pressure, material, and furnace number; Pay close attention to quotes that are far below the market price, and if the price of the same specification is significantly lower, there is a high probability of material shrinkage. For major industrial projects, the signed contract shall specify the requirements for brand trademark and data delivery as the basis for acceptance.
到货验收与安装要点,是保障管线安全运行的重要一环。到货开箱先核对型号规格、材质,检查阀体有无铸造砂眼磕碰;手动转动手轮,阀杆启闭灵活无卡顿;法兰密封面完好无损伤。压力管道用阀门,按照规范做壳体和密封试压,大型高压阀门留存试压记录。安装前清理管路内部焊渣杂质,防止杂质卡伤密封面;注意介质流向标识,止回阀、截止阀不可装反;高温高压工况,法兰垫片选用金属缠绕垫,禁止普通橡胶垫。电动阀门安装完成后,调试执行机构限位,避免开关过位损坏阀体。
The key points of arrival acceptance and installation are important for ensuring the safe operation of pipelines. Before unpacking upon arrival, check the model specifications and material, and inspect the valve body for any cast sand holes or bumps; Manually rotate the handwheel, the valve stem opens and closes flexibly without any jamming; The flange sealing surface is intact and undamaged. Valves for pressure pipelines shall undergo shell and seal pressure testing in accordance with specifications, and pressure testing records shall be kept for large high-pressure valves. Clean the welding slag and impurities inside the pipeline before installation to prevent impurities from damaging the sealing surface; Pay attention to the flow direction identification of the medium, check valves and globe valves cannot be installed in reverse; Under high temperature and high pressure conditions, metal wrapped gaskets should be used for flange gaskets, and ordinary rubber gaskets are prohibited. After the installation of the electric valve is completed, adjust the limit of the actuator to avoid damage to the valve body due to the over position of the switch.
投入运行之后的日常运维管理。定期巡检核心观察阀体、法兰填料位置有无外漏;高温蒸汽阀门避免频繁猛开猛关;电动执行机构做好防潮,定期校验限位;料浆类阀门,停车后做好管路介质排空,防止固体颗粒沉积卡阻阀门。出现外漏故障,优先泄压后再检修,严禁带压直接紧固填料压盖。对于电站、化工关键管线,建立阀门台账,记录型号、投用时间、检修记录,便于后期备件采购维护。
Daily operation and maintenance management after being put into operation. Regular inspections focus on observing whether there is any leakage in the valve body and flange packing positions; Avoid frequent and sudden opening and closing of high-temperature steam valves; The electric actuator should be moisture-proof and the limit should be checked regularly; Slurry type valves should be emptied of the pipeline medium after parking to prevent solid particles from depositing and blocking the valve. In case of external leakage failure, priority should be given to pressure relief before maintenance. It is strictly prohibited to directly tighten the packing gland under pressure. For key pipelines in power plants and chemical industries, establish a valve ledger to record the model, usage time, and maintenance records for easy procurement and maintenance of spare parts in the future.
山东区域工厂、化工、电厂、市政、水利项目,选择良工阀门济南销售处,优先选择可以提供前期技术选型、供货、资料交付、售后技术支持的正规渠道,不要只拼低价。合理选型、做好真伪甄别、规范安装运维,才能更好地发挥工业阀门的安全屏障作用,降低管线后期故障停工损失。
For factories, chemical plants, power plants, municipal projects, and water conservancy projects in Shandong region, choose Lianggong Valve Jinan Sales Office and prioritize formal channels that can provide early-stage technical selection, supply, data delivery, and after-sales technical support. Don't just bargain for low prices. Reasonable selection, accurate identification of authenticity, and standardized installation and operation are necessary to fully utilize the safety barrier function of industrial valves and reduce losses caused by pipeline failures and shutdowns in the later stage.
本文由上海良工阀门济南销售处友情奉献.更多有关的知识请点击:http://www.jnlgvf.com我们将会对您提出的疑问进行详细的解答,欢迎您登录网站留言.
This article is a friendly contribution from Shanghai Lianggong Valve Jinan Sales Office For more information, please click: http://www.jnlgvf.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message